A simple app for custom manufacturing management

Cake production From client order to finished cake: preferences, design, kitchen, delivery. Deadlines and responsible people under control—no more notes in a notebook. Furniture manufacturing From the first client call to delivery and installation. Orders by stage, a mobile app for measurers and installers, a portfolio of completed projects always at hand. Glass structure manufacturing Showers, partitions, mirrors, facades—the full cycle from measurement to installation. Sites on a map, drawings and photo reports on the team’s phone, coordination of contractors and claims. Metal structure manufacturing Gates, canopies, stairs, frames—on-site measurement and installation, in-shop production. Portfolio sorted by type, installation photo reports, control over deadlines and contractors. Modular building manufacturing Catalog of standard projects for quick sales, site visits with a map, installation with photo reports. From the first contact to an installed module—all in one system. Packaging manufacturing Boxes, bags, cups—a catalog of constructions with drawings, the full cycle from mockup to shipment. A dedicated quality control stage before dispatch—defects don’t reach the client. Signage manufacturing Signs, lightboxes, channel letters, pylons—from mockup to on-site installation. Mockups are approved inside the order card; the installer sees drawings and attaches photo reports right from the site. Window and door manufacturing PVC, aluminum, sliding—the full cycle from measurement to installation. Sites on a map, specs and drawings in the mobile app for measurers and installers.

Your database of clients, orders, etc.

Customers will appreciate it if you remember their allergies or can quickly find their previous order and do everything “as usual”.

Try now for free

Complete control over the production

Constantly calling and asking “How’s order #12345?” is not efficient. It’s much more convenient when all the information is available in real-time.

Try now for free

Work time planning and tracking

Work time tracking makes it possible to calculate the actual cost of services, better plan work, and analyze the efficiency of individual performers.

Try now for free
Time report
Timesheet
Time report
Timesheet

Scheduling work considering the team’s current load

It’s much easier to accurately estimate a possible completion date for a new client’s order when having all the relevant information about other orders at hand.

Try now for free
Gantt chart
Calendar
Map
Load
Gantt chart
Calendar
Map
Load

Performance analysis of the team at each stage

It would be interesting to compare, for example, how quickly different managers typically call customers to confirm orders after they’ve been placed on the website.

Try now for free
Funnel
Efficiency
Funnel
Efficiency

Standard processes, minimizing the human factor

If it’s determined that the chef needs to photograph the cake before dispatching it, and the courier after delivery, then that’s exactly how it will be, without the need for checking and reminders.

Try now for free

Own application for each team member

There might be many orders containing various information, but chefs only need to know what and when to prepare (displayed on a Kanban board on a large screen), while couriers need to know what, where, and when to deliver (listed on their phone with notifications).

Try now for free

Without programmers and significant expenses

You select a starter template that best suits your processes and receive a tool ready for use, assembled from small blocks. If needed, you can independently adjust fields and data interaction methods, manage access, configure other processes, and so on.

We’ll help you get started

We’ll reach out at a time that suits you and help set up Tracy so it works exactly as you want.

Contact us